SEARCH
Philippine Government Forms All in One Location
Tweet
Share
Application for Steam/Gas/Hydro Turbine Installation
BWC application form for steam/gas/hydro turbine installation
Your Browser Doesn't Support Canvas. Showing the Text Content of the PDF Instead: Republic of the Philippines
DEPARTMENT OF LABOR AND EMPLOYMENT
Regional Office No. ______
APPLICATION FOR STEAM/GAS/HYDRO TURBINE INSTALLATION
1.
Name of Establishment: ______________________________________________________________________
2. Complete Business Address: __________________________________________________________________
3. Owner/Manager and Address: ________________________________________________________________
_____________________________________________________________________________________________
4. Where Steam/Gas/Hydro Turbine is installed:
___________________________________________________________
____________________________________________________________________________________________
5. Plans to be submitted: Submit (in quadruplicate) the foundation plan with design, installation
and location of the turbine. The plans shall be prepared, signed and sealed by a Professional
Mechanical Engineer. Plan shall also bear the name and signature of owner or manager of the
establishment.
6. Steam/Gas/Hydro Turbine Data:
a. Manufacturer: ___________________________________________________________________________
b. Type or Classification: ____________________________________________________________________
c.
Serial Number: __________________________________________________________________________
d. Place of Origin: __________________________________________________________________________
e. Date Manufactured: _____________________________________________________________________
f.
Turbine Generator Rating: _______________________________________________________________
g. Power Factor: ___________________________________________________________________________
h. Throttle Pressure: ___________________________________________________________________psig
i.
Throttle Temperature: _________________________________________________________________ F
j.
Exhaust Pressure: _________________________________________________________________Hg abs
k. Number of Extracting Opening: _________________________________________________________
7. Printed Name and Signature of Person
To Supervise the installation: ________________________________________________________________
PME Registry No. _______________ Date: _______________
P.T.R. No. ___________________ Date: _______________
TIN: ___________________________________________
8. Other accessories or equipment: ______________________________________________________________
______________________________________________
Printed Name and Signature of Owner/Manager
Company TIN: _________________________________
Company Tel. No.
Application No. ______________________________________