Steam Turbine Operation Permit

BWC permit form for steam turbine operation

Your Browser Doesn't Support Canvas. Showing the Text Content of the PDF Instead: Republic of the Philippines
DEPARTMENT OF LABOR AND EMPLOYMENT
Regional Office No. ___

PERMIT TO OPERATE STEAM TURBINE
(This permit is valid only upon payment of inspection fee and expires one-year from date of inspection unless otherwise revoked)

STDL No.

Date of Inspection:

Pursuant to Article 165, Chapter II, Book IV of the Labor Code of the Philippines (LCP), as amended and
its implementing rules and regulations. Rule 1190 of the Occupational Safety and Health (OSHS), as amended, it is
hereby certified that herein described steam turbine, inspected by the duly authorized representative of the
Department of Labor and Employment has been found to be in condition safe for operation at a throttle pressure not
to exceed_____ psig and _______ ⁰F temperature.
Name of Owner/User
Address
Manufacturer or Brand Name
Type & Classification
Place of Origin
Turbine Generator Rating
Exhaust Pressure
No. of extraction opening

Kw

Serial No.
Date Manufactured
Power Factor
Hg. Abs.

Inspection Fee P
Official Receipt No.
Date
Regional Director
(Please post this permit in a conspicuous place enclosed in a glass frame and accessible to all concerned inspecting authority )