Electrical Permit

TIEZA application form for business permit

Your Browser Doesn't Support Canvas. Showing the Text Content of the PDF Instead: NBC FORM NO. A - 02

Tourism Infrastructure and Enterprise Zone Authority

Office of the Building Official

CIVIL/STRUCTURAL PERMIT
BUILDING PERMIT NO.

C/SP NO

APPLICATION NO.

BOX 1 (TO BE ACCOMPLISHED IN PRINT BY THE OWNER/APPLICANT)
OWNER/APPLICANT

LAST NAME

FOR CONSTRUCTION OWNED

FIRST NAME
FORM OF OWNERSHIP

M.I.

TIN

USE OR CHARACTER OF OCCUPANCY

BY AN ENTERPRISE
ADDRESS:

NO.,

STREET,

LOCATION OF CONSTRUCTION:

BARANGAY,

CITY/MUNICIPALITY

ZIP CODE

TELEPHONE NO

LOT NO. _______________ BLK NO. ________________ TCT NO. ______________________ TAX DEC. NO.___________________

STREET___________________ BARANGAY ____________________________________________________ CITY/ MUNICIPALITY OF ______________________________

SCOPE OF WORK
NEW CONSTRUCTION
ERECTION
ADDITION
ALTERATION

RENOVATION ________________________
CONVERSION ________________________
REPAIR _____________________________
MOVING _____________________________

RAISING ______________________________________
DEMOLITION __________________________________
ACCESSORY BUILDING/STRUCTURE _____________
OTHERS (Specify) ______________________________

BOX 2 (TO BE ACCOMPLISHED BY THE DESIGN PROFESSIONAL)
NATURE OF CIVIL/STRUCTURAL WORKS:
STAKING

ERECTION/LIFTING

PRESTRESS WORKS

EXCAVATION

CONCRETE FRAMING

MATERIAL TESTING

SOIL STABILIZATION

STRUCTURAL STEEL FRAMING

STEEL TOWERS

PILING WORKS

SLABS

TANKS

FOUNDATION

WALLS

OTHERS (Specify)___________________________

PREPARED BY _______________________________________________________________________________________________________________

BOX 3

BOX 4

DESIGN PROFESSIONAL, PLANS AND SPECIFICATIONS

SUPERVISOR/IN-CHARGE OF CIVIL/STRUCTURAL WORKS

CIVIL/STRUCTURAL ENGINEER
(Signed and Sealed Over Printed Name)

CIVIL/STRUCTURAL ENGINEER
(Signed and Sealed Over Printed Name)

Date________________________

Date________________________

Address

Address

PRC. No

Validity

PRC. No

Validity

PTR. No

Date Issued

PTR. No

Date Issued

Issued at

TIN

Issued at

TIN

BOX 5

BOX 6

BUILDING OWNER

WITH MY CONSENT: LOT OWNER

(Signature Over Printed Name)
Date___________________
Address
C.T.C. No.

(Signature Over Printed Name)
Date___________________
Address

Date Issued

Place Issued

C.T.C. No.

Date Issued

Place Issued

TO BE ACCOMPLISHED BY THE PERMITS AND LICENSES DIVISION
BOX 7
RECEIVED BY:

DATE:
FIVE (5) SETS OF 20”X30” & ONE (1) A3 OF CIVIL/STRUCTURAL DOCUMENTS

CIVIL/STRUCTURAL DESIGNS COMPUTATIONS, PLANS AND SPECIFICATIONS

COST ESTIMATES

BILL OF MATERIALS

OTHERS (Specify) __________________________________

BOX 8
PROGRESS FLOW
IN
DATE

OUT
TIME

DATE

TIME

PROCESSED BY:

CIVIL/STRUCTURAL
OTHERS (Specify)

BOX 9

ACTION TAKEN:

PERMIT IS HEREBY ISSUED SUBJECT TO THE FOLLOWING:
1. That under Article 1723 of the Civil Code of the Philippines, the engineer (or architect) who drew up the plans and
specifications for the building/structure is responsible for damages if within fifteen (15) years from the completion of the
building/structure, the same should collapse due to defect in the plans or specifications or defect sin the ground. The
engineer or architect who supervises the construction shall be solidarily liable with the contractor should the edifice collapse
due to defect in the construction or the use of inferior materials.
2. That the proposed civil/structural works shall be in accordance with the civil/structural plans filed with this office and in
conformity with the latest National Structural Code of the Philippines, the National Building Code and its IRR.
3. That prior to any construction activity, a duly accomplished prescribed “Notice of Construction” shall be submitted to the
Office of the Building Official.
4. That upon completion of the construction, the licensed full-time inspector and supervisor/in-charge of construction works
shall submit the entry to the logbook duly signed and sealed to the Building Official including as-built plans and other
documents and shall also accomplish and submit a certificate of completion stating that the civil/structural works conform to
the provisions of the National Structural Code of the Philippines, the National Building Code and its IRR.
5. That this permit is null and void unless accompanied by the building permit.
PERMIT ISSUED BY:

BUILDING OFFICIAL
(Signature Over Printed Name)
Date ___________________