SEARCH
Philippine Government Forms All in One Location
Tweet
Share
06-2 Three-Year Development/Utilization Work Program
MGB work program for three - year development/utilization
Your Browser Doesn't Support Canvas. Showing the Text Content of the PDF Instead: MGB Form No. 06-2
Republic of the Philippines
Department of Environment and Natural Resources
MINES AND GEOSCIENCES BUREAU
North Avenue, Diliman, Quezon City
THREE-YEAR
DEVELOPMENT/UTILIZATION WORK PROGRAM
1.0
Corporate Information
1.1
Project Name
1.2
Company Name, Address, Telephone, Fax Number
1.3
Contact Person/Designation
2.0
Project Description
2.1
Project Details
2.1.1 Location
2.1.2 Estimated Capital Cost
2.1.3 Commodity
2.1.4 Present Status of the Project (e.g. Development/Construction
Stage, Operation Stage or Expansion Stage)
2.1.5 Description of Mining Method
2.1.6 Estimated Daily/Annual Production
2.1.7 Description of Process Plant/Mill (rated capacity, type of
processing)
2.2
Mineral Reserves
2.2.1 Reserves (tonnes in each category)
2.2.2 Average grade of ore for each mineral commodity
2.2.3 Cut-off grade
2.2.4 Estimated Mine Life (years)
2.2.5 Potential for Additional Reserves
2.3
Access/Transportation
2.3.1 Road (preference and alternates)
2.3.2 Air Access (origin and destination points)
2.3.3 Shipping (preferred port facilities and alternates)
2.4
Utilities
2.4.1 Power Supply Requirements and Alternatives
2.4.2 Water Supply Requirements and Alternatives
2.5
Mining and Milling Equipment
2.5.1 List of mobile and fixed equipment for development and
construction (specify if leased/ purchased)
2.5.2 List of mobile and fixed equipment for mining (specify if
leased/purchased)
2.5.3 List of mobile and fixed equipment for mineral processing
2.6
Workforce Information
2.6.1 Total Operational Workforce
2.6.2 Staff Organizational Set-up
2.6.3 Housing Options
2.7
Development Program
2.7.1 State of development
2.7.2 Description of planned activities
1
MGB Form No. 06-2
2.7.3
2.7.4
2.7.5
2.8
Targeted Sites/Areas, accompanied by a 1:50,000 location map
showing areas of planned development sites, camp/housing
facilities, process plant location and other facilities
Schedule and estimated cost per annum
Gantt Chart
Production Schedule and estimated costs per annum
3.0
Community Development Programs and estimated total costs
4.0
Environmental Protection and Management Cost Estimate (to include Mine
Safety and Health)
5.0
Signature of Person who prepared the Work Program, specify PRC License
number and PTR number
2